(A)live on site at the Brightwater worksite in the United States

Brightwater worksite in the United States
The (A)live on site program was deployed from August 13 to 21, 2008 at the Brightwater tunnel worksite; the 41 employees involved in the program learned about the risks associated with operating lifting equipment. Developed by VINCI Construction Grands Projets and launched in February 2008 at the Duplex A86 worksite, (A)live on site is a program designed to raise safety awareness by disseminating knowledge and promoting appropriate individual behaviour in the face of daily workplace risk.
Worksites - 10/07/2008

Transportation

Technical innovation for the piles of the Kincardine Bridge in Scotland

Kincardine BridgeVINCI Construction Grands Projets teams are using an alternative to the cutting off of reinforced concrete piles. This technique, called “automatic cut-off,” enhances worksite safety, saves time, and helps reduce foundation-construction costs.
Worksites - 10/01/2008

Transportation

Cairo subway: baptism of the Cleopatra TBM

Cleopatra TBMThe baptism ceremony for the Cleopatra Tunnel Boring Machine (TBM) was held on September 3, 2008. The event was attended by Egyptian Prime Minister Ahmed Nasif, Minister of Transportation Mohamed Mansour and representatives of the client, the National Authority for Tunnels (NAT). The ceremony took place at the launch pit (see photo). Lead contractor VINCI Construction Grands Projets (28.5%) is currently fulfilling the civil engineering mandate for Phase 1 on Line 3 of the Cairo subway in conjunction with Arab Contractors, Bouygues and Orascom.
Events - 09/23/2008

Transportation

Videos


Qatar/Barhain Causeway - The world's longest bridge

All videos